HomeBlogComparisons

Moving from Google Workspace to Microsoft 365: A Migration Guide

Two laptops side by side on an office desk with a paper checklist and a coffee mug

A Google Workspace to Microsoft 365 migration moves mail, calendars, contacts and Drive files into Exchange Online, OneDrive and SharePoint with two tools Microsoft includes in the subscription: the Google Workspace migration in Exchange Online and Migration Manager. Most of that data arrives intact, and for a small business the project takes several weeks with a single cutover weekend.

The trouble is at the edges. Google Docs, Sheets and Slides are converted to Word, Excel and PowerPoint files and can lose formatting on the way. Shared drive permissions only survive if you rebuild the matching groups first. Google Groups, Chat history, Sites and external sharing links do not migrate at all. A sound plan accepts those facts up front: run both systems side by side for a short coexistence period, move mail on a planned cutover weekend, and put real training time in front of people who have only ever used Gmail. The project is measured in weeks, and the risk lives in the planning rather than the data copy.

What you are movingMicrosoft's toolWhat arrivesHand work
MailGoogle Workspace migration in Exchange OnlineMessages, labels as folders, rules (switched off)Automatic replies, filter review
CalendarSame migration batchEvents and recurring meetingsShared calendars, room bookings
ContactsSame migration batchContacts with up to three addresses eachGmail tags, custom fields
My DriveMigration Manager to OneDriveFiles, version history, permissions when identities are mappedOrphaned files, shortcuts, restricted files
Docs, Sheets, SlidesMigration Manager conversionWord, Excel and PowerPoint filesFormatting, scripts, unusual formulas
Shared drivesMigration Manager to SharePointFiles and permissions when a matching group is mappedGroup recreation, external links reissued
Google GroupsNoneNothingRebuild as groups, distribution lists or shared mailboxes
Chat, Sites, MapsNoneNothingExport Chat for records; rebuild Sites in SharePoint
Forms, DrawingsMigration ManagerForms with a Forms destination; Drawings as PNG imagesReview each one

What moves cleanly from Google Workspace to Microsoft 365?

Mail, calendar and contacts move with the Google Workspace migration built into Exchange Online. Microsoft's migration documentation lists mail and rules, calendar and contacts as the supported data, and the process runs in batches. Gmail labels arrive as Outlook folders, so a message with three labels shows up in three folders; warn people. Gmail filters become Outlook rules and are migrated switched off, so each person should review them before turning them on.

Files move with Migration Manager in the Microsoft 365 admin center. It scans each drive, maps Google users and groups to Microsoft 365 identities, and copies My Drive content to OneDrive and shared drives to SharePoint. Microsoft's Migration Manager FAQ states that when identities are fully mapped, content is reshared after migration so each user keeps the access they had, and that version history moves with each file. Copies are incremental, and nothing is deleted from Google. Microsoft's overview also describes a Lite mode for tenants under 300 licenses that skips the scan and mapping steps; avoid it if you have shared drives, because the mapping is what preserves permissions.

What does not move, and what do you do about it?

Start with the documents. Migration Manager converts .gdoc, .gsheet and .gslide files into .docx, .xlsx and .pptx through Google's export, as described on Microsoft's unsupported files page. Plain documents convert well. Long documents with custom styles, Sheets that depend on Google-only functions or Apps Script, and Slides with embedded fonts need a review pass. We have each department name its twenty most important files, open each in Office after the first migration run, and log what needs fixing.

Next, permissions. Shared drive permissions transfer only when a Microsoft 365 group with the same membership exists and is mapped to the Google group before the migration runs; that is Microsoft's own recommendation in the FAQ. External sharing links are not recreated, and content is not shared with external collaborators at all. Every link you have handed to a client or an accountant stops working and must be reissued from SharePoint or OneDrive under the sharing policy you choose for the new tenant.

Then the things with no migration path. Google Groups are rebuilt by hand as Microsoft 365 groups, distribution lists or shared mailboxes, depending on how each was used. Google Chat history has no supported import into Teams; export it and start fresh. Sites and Maps cannot be exported by the tool, so Sites are rebuilt as SharePoint pages. Forms migrate when you set a Forms destination, Drawings arrive as PNG images, and shortcuts, orphaned files and files marked restricted are skipped. On the mail side, Microsoft notes that vacation settings, shared calendars, room bookings and event colors are not migrated. None of these are showstoppers, but each needs an owner.

How does coexistence work while both systems are live?

Coexistence is the period when Microsoft 365 is provisioned and receiving copied data while Google is still the system of record. Microsoft's prerequisites call for users to be provisioned in Microsoft 365 before the batches run, and for a mail routing subdomain on each side so the two tenants can pass messages while delivery still goes to Google. The first mailbox and file batches then copy in the background over several nights.

A few rules keep coexistence from turning into a mess. Do not rearrange folders during the copy; the FAQ warns that renamed folders are treated as new content and duplicated on the next pass. Freeze new Google Groups and shared drives once mapping is done. Add new hires in Microsoft 365 first. Disable Google retention and archive rules that delete or move mail, because the migration tool reports those items as missing. Our cloud migration FAQ covers the general sequencing.

Use the time to make the decisions the tools will not make for you: which shared drives become Teams-connected SharePoint sites and which become plain libraries (our SharePoint vs OneDrive FAQ explains the split), what the external sharing policy will be, who owns each rebuilt group, and whether the plan is Business Standard or Business Premium. Premium adds Intune, Defender for Business and conditional access, which belong switched on before cutover; our Premium vs Standard comparison lays out the difference.

What happens on the cutover weekend?

Cutover is the moment mail delivery moves. On Friday evening the final incremental file pass runs and the last mail batches complete overnight. On Saturday the MX record is pointed at Exchange Online and the SPF, DKIM and DMARC records are updated so mail from the new tenant is not treated as spam; our email authentication FAQ covers those records. Google keeps receiving stragglers for a day or two through the routing subdomain, and a final small batch picks them up.

Devices are the other half of the weekend. Phones need the Outlook app and a work account; laptops need Microsoft 365 Apps and OneDrive signed in, and on Business Premium, enrolling them in Intune during cutover puts the security baseline in place on day one. Keep Google licensed and read-only for a month or two afterwards so a missing file can be pulled by hand, and do not cancel it until every department has signed off. Once the data is in Microsoft 365 it is yours to protect, so a third-party backup belongs on the post-migration list; our Microsoft 365 backup guide explains why.

How do you train people who have only ever used Gmail?

Training is where Google to Microsoft migrations succeed or fail, because the mental model changes. Gmail users think in labels and search; Outlook users think in folders and rules. Drive users share by link; SharePoint users share by site membership. Thirty minutes per group before cutover, with the converted files on screen, prevents most of the calls.

Keep it concrete: where the migrated labels landed, how to share from OneDrive and what the recipient sees, how a converted Doc looks in Word, and the fact that Teams replaces Chat and Meet without bringing Chat history along. Write a one-page "where things went" sheet per department, and treat the Monday after cutover as a support event with someone reachable from seven. If the platform question is still open, start with our comparison of Microsoft 365 vs Google Workspace.

Google Workspace to Microsoft 365 migration checklist

The order we follow for a migration from Google Workspace to Microsoft 365, condensed to one list:

  1. Inventory users, mailbox sizes, Google Groups, shared drives and their owners, external shares, and every scanner, app or website form that sends mail through Gmail.
  2. Choose licenses, and decide which shared drives become Teams-connected SharePoint sites and which become plain libraries.
  3. Verify the domain in Microsoft 365, create the two mail routing subdomains, and provision every user before any batch runs.
  4. Secure the tenant first: MFA, conditional access and Defender policies on, before it holds company data.
  5. Build Microsoft 365 groups with matching membership and map users and groups in Migration Manager.
  6. Turn off Google retention and archive rules that delete or move mail, so the migration report stays accurate.
  7. Run a pilot batch of mailboxes and drives, then have each department check its twenty most important files.
  8. Copy the rest in the background, and freeze folder reorganizations, new groups and new shared drives.
  9. On cutover weekend, run the final passes, point MX at Exchange Online, and update SPF, DKIM and DMARC.
  10. Set up phones and laptops, reissue external sharing links, and staff the help desk for the first Monday.
  11. Keep Google read-only until every department signs off, and add third-party backup for Microsoft 365.

Frequently asked questions

Can we keep our domain and email addresses when we move to Microsoft 365?

Yes. You verify the same domain in Microsoft 365, create users with the same addresses, and change the MX record at cutover so mail is delivered to Exchange Online instead of Gmail. Nobody's address changes. Aliases and group addresses must be recreated deliberately, since Google Groups do not migrate, and the SPF, DKIM and DMARC records must be updated so the new tenant's mail is trusted. Keep the Google tenant receiving mail through the routing subdomain for a short overlap.

Do Google Docs convert to Word automatically during migration?

Yes. Migration Manager converts Google Docs, Sheets and Slides into Word, Excel and PowerPoint files as it copies them and leaves the originals untouched. Ordinary documents convert well. Files that use Google-specific functions, Apps Script, unusual fonts or heavy custom styling can lose fidelity, so review the important ones after the first pass and fix them before cutover. Formatting differences are the most common complaint in the first week.

What happens to Google Groups and shared drive permissions?

Google Groups do not migrate. Each is rebuilt in Microsoft 365 as a Microsoft 365 group, a distribution list or a shared mailbox, depending on how it was used. Shared drive permissions do transfer, but only when a Microsoft 365 group with matching membership exists and is mapped to the Google group in Migration Manager before the copy runs. External sharing links are dropped in every case and must be reissued after migration.

How long does a Google Workspace to Microsoft 365 migration take?

For a small or mid-sized business the project usually spans several weeks from planning to the end of coexistence, with most of that time spent on decisions and background copying rather than downtime. The cutover itself is a single weekend. What stretches the timeline is the number of shared drives, the amount of external sharing to reissue and the number of Google Groups to rebuild. A scan of every drive before you commit to a date is the only reliable estimate.

What tool migrates Google Workspace to Microsoft 365?

Two Microsoft tools, both included with the subscription. The Google Workspace migration in Exchange Online moves mail and rules, calendars and contacts in batches, run automatically or manually from the Exchange admin center or with PowerShell. Migration Manager in the Microsoft 365 admin center moves My Drive to OneDrive and shared drives to SharePoint. As of October 2026, Microsoft's Google Workspace migration page says the mail migration isn't available for GCC High or DoD tenants, so those need a different method.

Can we migrate from Microsoft 365 to Google Workspace instead?

Yes, with Google's tools. Google's data import tool in the Admin console brings Exchange Online mail, calendar events, contacts and tasks into Google Workspace, up to 1,000 users at a time, and Google covers OneDrive files in a separate guide. The same planning rules apply in reverse: map groups and permissions first, run a coexistence period, and expect Office files and Teams history to need their own decisions.

What is included when NetSys runs the migration?

An assessment of the source (users, mailbox sizes, shared drives, DNS and the applications that send mail), a destination tenant secured to a baseline before it holds data, identity mapping, background copies of mail, calendars, contacts and files, groups and shared mailboxes recreated, a cutover runbook with a written rollback plan, Outlook and mobile profiles reconfigured through Intune, a help desk staffed for cutover week, and Google kept readable for an agreed period.

How does the project start?

With that assessment. From the user list, the shared drives and their owners, the DNS records and the list of devices and apps that send mail, we pick the pilot users, secure the tenant and agree a dated plan and cutover window before the bulk copy starts.

What affects the cost of a Google Workspace to Microsoft 365 migration?

The number of users and mailboxes, the volume of data in Drive, how many shared drives and Google Groups need rebuilding, how much external sharing has to be reissued, the apps and integrations that send mail, and how much support you want during cutover. Microsoft's migration tools come with the subscription. We scope the project before quoting and don't publish prices; ongoing tenant management is a separate decision.

Who supports staff during and after cutover?

The engineers who moved the mail. The help desk is staffed for cutover week and is open seven days a week from 4 a.m. to 11 p.m. Eastern, and emergency service is available 24/7 if mail stops flowing. After the first week the tenant moves into Microsoft 365 management on the month-to-month agreement, or to your own IT staff with the runbook and documentation.

Planning your migration with NetSys

Our Microsoft 365 migration service runs this whole sequence: licensing, identity mapping, mailbox and file batches, the cutover weekend, device setup and training, then manages the tenant afterwards on a month-to-month agreement with security switched on from day one. Talk to us before you pick a cutover date and we will scan your drives and tell you what will and will not move.

Microsoft 365 Migration

Discuss microsoft 365 migration for your business.

Tell us about your current systems, the result you need and your timeline. We will discuss the work, responsibilities and pricing before you decide on an engagement.

Explore Microsoft 365 Migration 845-203-3914